Spokane Juvenile Court Services, WA, Control Booth Upgrade $437,112.00 
Engineer Mw Engineering: Bruce Erdman 
Contractor: ARC Security Integration, General Contractor 
Spokane County Construction Manager: Don Coon 
Completion Date: 6/30/13 
 
Scope: Replaced and updated CCTV to IP cameras (Vicon), Intercom (Harding) , 
Relay Electronics to PLC (Modicon PLC), New Relay Backboards, Touchscreen (Citect Software) & Head-end replacement (Racks and Back boards). 
 
ASI Sub Contractors: 
ARC Electric & Lighting: Conduit, raceways and 120v applications. 
Dardan Construction: Casework, glass & flooring
Snohomish County Jail, WA, Security Electronics Upgrade $482,186.00 
Engineer: R&N Systems Design L.L.C., Dennis Sebo 
Contractor: Metroplex Control Systems, Rich Schamberger 
Completion Date: 2/28/14 
 
 
Scope: Installation of all field devices (IP Cameras, Intercom stations, 
Watch tour, etc.) Installation & testing of all cable (Fiber backbone, CAT 6 and various other types of cable). Installation and testing of head-end equipment being provided by Metroplex Control Systems, (PLC, Intercom, CCTV, Touchscreens, watch tour etc.) Arc Security Integration is a subcontractor to MCS for this scope of work. 
 
ASI Sub Contractors: 
PowerCom: Provide, install and test all Fiber cable and assist with installation and testing of CAT 6 cable.
Adult Detention Building DVR Upgrade, Spokane County Jail, WA $209,224.00 
Engineer: Coffman Engineers, Steve Smith 
Contractor: ARC Security Integration, General Contractor 
Spokane County Construction Manager: Don Coon 
Estimated Completion Date: 4/30/14 
 
Scope: Update and replace existing CCTV DVR Video System. Provide, Install and Program new state of the art storage/recording system using Vicon and Pivot 3 equipment. Provide new Air conditioning and Electrical work for existing equipment room and provide new connections to power for new UPS System. 
 
ASI Sub Contractors: 
Pro Mechanical Services: Provide and Install new Air Conditioning Unit in existing equipment room. 
ARC Electric: Provide Electrical installation for new Air Conditioner unit and power required for new UPS System.
Franklin County Jail Addition, Pasco, WA, Security Elec. Upgrade $628,113.00 
Engineer: HK Engineers, Frank Hopkins 
Contractor: Lydig Construction, Tony Corigliano, PM 
Completion Date Phase I: 3/19/14 Estimated Completion Date Phase II: 9/30/14 
 
Scope: Provide & Install electronic relay backboards built to UL 508 standards, intercom system head-end components, CCTV system, PLC, Touchscreen, Duress and Fence/Intrusion Detection. Provide and Install security equipment in New Housing Unit Addition and interface existing conditions and electronics into a site wide integrated security system. Project to be completed in 2 phases.
Martin Hall Juvenile, Medical Lake WA. $50,135.00 
Owner: Martin Hall Juvenile Facility Board 
Contractor: Arc Security Integration, Inc. (Design Build) 
Completion Date: 1/30/15 
 
Scope: Replace existing control panels with new touch screen control. Provide, program and install new PLC and control relay backboards (built in UL 508 Shop). Provide and install new CCTV Monitors and replace existing casework with new laminated countertops. 
 
Spokane County Adult Jail, Spokane, WA. $41,704.00 
Owner: Spokane County Jail 
Contractor: Arc Security Integration, Inc. (Design Build).  
Completion Date: November 2016 
 
Scope: Replace existing HMI computers and software with new computers and Citect Scada software. Program new HMI software to match existing control functions and add new functionality. Replace Existing GE Fanuc 90-30 PLC CPU with Modicon M340 PLC, Interface to existing GE fanuc VersaMax Eth I/O. Re-Program exising Harding DXL Intercom system to function with new system.

Airway Heights Correctional Center, Airway Heights WA. $970,372.00 
Owner: Department of Corrections Washington State 
Engineer: KMB Design Groups, Inc. Steve Helms 
Contractor: Arc Electric and Lighting Corp.  
Completion Date: March 2017 
 
Scope: Replace existing relay logic hard wired control panels in 10 buildings with new touch screens and PLC’s .Replace all the relays with new UL 508 relay backboards. Replace existing analog intercom system with new Harding digital intercom. Interface with Genetec video system (provided by others) 

Lincoln County Juvenile, Citect HMI Upgrade, Newport OR. $7,700.00 
Owner: Lincoln County Sheriff’s Office, Sgt. Tom Graham 
Contractor: ARC Security Integration, General Contractor 
Completion Date: 9/27/13 
 
 
Scope: Provide, Install & Program new Citect HMI Software to replace older win cc flex software.
Lincoln County Adult Jail, past and ongoing work, Newport OR. 
Owner: Lincoln County Sheriff’s Office 
Contractor: ARC Security Integration, General Contractor 
Completion Date: Ongoing Service 
 
 
Scope: Provide, Upgrade and maintain HMI (Citect Scada), Modicon PLC's (Door Control and Integrated Flush/Water Control), and Vicon Valerus video system. 
Coffee Creek Correctional Facility, past and ongoing work, Wilsonville OR. 
Owner: DOC Oregon 
Contractor: ARC Security Integration, General Contractor 
Completion Date: Ongoing Service 
 
 
Scope: Provide, Install & Program new Citect HMI Software to replace older wonderware software, Upgrade Video system to Vicon Valerus, upgrade existing Modicon Quantum PLC's to newer UNITY programing environment, replace housing unit control point hard panels with touch screen HMI control stations (Citect Scada).
Kootenai County Juvenile, Coeur d’ Alene ID. $129,00.00 
Owner: Kootenai County ID 
Contractor: Camtek Inc. General Contractor 
Estimated Completion Date: 4/30/15 
 
Scope: Provide electronic relay backboards built to UL 508 standards, intercom system head-end components, PLC, Touchscreen. Provide and Install new Casework Countertops.
Kootenai County Adult Jail HMI / PLC Upgrade, Coeur d’ Alene ID. $30,559.00 
Owner: Kootenai County ID 
Contractor: Camtek Inc. General Contractor 
Estimated Completion Date: 6/30/16 
 
Scope: Provide, Upgrade Existing Citect HMI Software, Upgrade existing Modicon Quantum PLC to the new Unity programing environment.
J. Paul Taylor Juvenile Facility, NM, Security Elec. Upgrade $107,559.00 
Engineer: Arc Security Integration, Design Build 
Owner: Teresa P Lee, Physical Plant Supervisor 
Contractor: APIC Solutions, Jesse Pickard 
Completion Date: 4/15/13 
 
Scope: Provide electronic relay backboards built to UL 508 standards, intercom system head-end components, interface with CCTV system (provide by others), PLC, Touchscreen. APIC Solutions will be performing the installation and testing of the new security system. ASI will be available for onsite technical assistance if required.​ 
San Juan County Jail, Citect HMI & PC Upgrade, San Juan NM. $43,177.00 
Owner: San Juan County Sheriff’s Office 
Contractor: APIC Solutions, General Contractor 
Estimated Completion Date: 6/30/14 
 
Scope: Provide 6 new Dell PC’s loaded with Citect HMI Software and programmed to meet the existing conditions.
San Juan Juvenile Facility, New Mexico $118,887.00 
Owner: San Juan County Sheriff’s Office 
Contractor: APIC Solutions, General Contractor 
Estimated Completion Date 3/30/15 
 
Scope: Provide electronic relay backboards built to UL 508 standards, intercom system head-end components, interface with CCTV system (provided
 by others), PLC, Touchscreen.  
 
Kona Judiciary Complex, Kona HI $510,000.00 
Owner: DAGS 
Engineer: HK Engineers 
Contractor: Hawaiya Technologies 
Estimated Completion Date: Aug 2020 
 
Scope: provide new security electronics systems to include, Touch Screen, PLC, Intercom, CCTV, Access Control, Man down and duress systems. 

MCCC, Maui Community Correctional Complex $971,000.00 
Owner: DAGS 
Engineer: Buford Geoff & Assoc.  
General Contractor: F&H Construction, Inc.  
Estimated Completion Date: In progress 
 
Scope: Replace existing relay logic hard wired control panels in 7 buildings with new touch screens and PLC’s .Replace all the relays with new UL 508 relay backboards. Replace existing analog intercom system with new Harding digital intercom. Replace existing CCTV System with New Vicon CCTV Equipment. Interface and integrate all systems. 

Kane County Jail, Intercom and CCTV upgrade $174,152.00 
Owner: Kane County Jail 
Contractor: ARC Security Integration, General Contractor 
Completion Date: 4/16/2018 
 
 
Scope: Provide, Install & Program new Vicon Valerus CCTV system, assist installaion of new cameras, and Upgrade existing Harding DXI intercom to the Harding DXL intercom system.