Spokane Juvenile Court Services, WA, Control Booth Upgrade $437,112.00
Engineer Mw Engineering: Bruce Erdman
Contractor: ARC Security Integration, General Contractor
Spokane County Construction Manager: Don Coon
Completion Date: 6/30/13
Scope: Replaced and updated CCTV to IP cameras (Vicon), Intercom (Harding) ,
Relay Electronics to PLC (Modicon PLC), New Relay Backboards, Touchscreen (Citect Software) & Head-end replacement (Racks and Back boards).
ASI Sub Contractors:
ARC Electric & Lighting: Conduit, raceways and 120v applications.
Dardan Construction: Casework, glass & flooring
Snohomish County Jail, WA, Security Electronics Upgrade $482,186.00
Engineer: R&N Systems Design L.L.C., Dennis Sebo
Contractor: Metroplex Control Systems, Rich Schamberger
Completion Date: 2/28/14
Scope: Installation of all field devices (IP Cameras, Intercom stations,
Watch tour, etc.) Installation & testing of all cable (Fiber backbone, CAT 6 and various other types of cable). Installation and testing of head-end equipment being provided by Metroplex Control Systems, (PLC, Intercom, CCTV, Touchscreens, watch tour etc.) Arc Security Integration is a subcontractor to MCS for this scope of work.
ASI Sub Contractors:
PowerCom: Provide, install and test all Fiber cable and assist with installation and testing of CAT 6 cable.
Adult Detention Building DVR Upgrade, Spokane County Jail, WA $209,224.00
Engineer: Coffman Engineers, Steve Smith
Contractor: ARC Security Integration, General Contractor
Spokane County Construction Manager: Don Coon
Estimated Completion Date: 4/30/14
Scope: Update and replace existing CCTV DVR Video System. Provide, Install and Program new state of the art storage/recording system using Vicon and Pivot 3 equipment. Provide new Air conditioning and Electrical work for existing equipment room and provide new connections to power for new UPS System.
ASI Sub Contractors:
Pro Mechanical Services: Provide and Install new Air Conditioning Unit in existing equipment room.
ARC Electric: Provide Electrical installation for new Air Conditioner unit and power required for new UPS System.
Martin Hall Juvenile, Medical Lake WA. $50,135.00
Owner: Martin Hall Juvenile Facility Board
Contractor: Arc Security Integration, Inc. (Design Build)
Completion Date: 1/30/15
Scope: Replace existing control panels with new touch screen control. Provide, program and install new PLC and control relay backboards (built in UL 508 Shop). Provide and install new CCTV Monitors and replace existing casework with new laminated countertops.
Spokane County Adult Jail, Spokane, WA. $41,704.00
Owner: Spokane County Jail
Contractor: Arc Security Integration, Inc. (Design Build).
Completion Date: November 2016
Scope: Replace existing HMI computers and software with new computers and Citect Scada software. Program new HMI software to match existing control functions and add new functionality. Replace Existing GE Fanuc 90-30 PLC CPU with Modicon M340 PLC, Interface to existing GE fanuc VersaMax Eth I/O. Re-Program exising Harding DXL Intercom system to function with new system.
Airway Heights Correctional Center, Airway Heights WA. $970,372.00
Owner: Department of Corrections Washington State
Engineer: KMB Design Groups, Inc. Steve Helms
Contractor: Arc Electric and Lighting Corp.
Completion Date: March 2017
Scope: Replace existing relay logic hard wired control panels in 10 buildings with new touch screens and PLC’s .Replace all the relays with new UL 508 relay backboards. Replace existing analog intercom system with new Harding digital intercom. Interface with Genetec video system (provided by others)