Projects

J. Paul Taylor Juvenile Facility, NM, Security Elec. Upgrade     $107,559.00
Engineer: Arc Security Integration, Design Build
Owner: Teresa P Lee, Physical Plant Supervisor
Contractor: APIC Solutions, Jesse Pickard
Completion Date: 4/15/13

ScopeProvide electronic relay backboards built to UL 508 standards, intercom system head-end components, interface with CCTV system (provide by others), PLC, Touchscreen. APIC Solutions will be performing the installation and testing of the new security system. ASI will be available for onsite technical assistance if required.

Spokane Juvenile Court Services, WA, Control Booth Upgrade     $437,112.00
Engineer Mw Engineering: Bruce Erdman
Contractor: ARC Security Integration, General Contractor
Spokane County Construction Manager: Don Coon
Completion Date: 6/30/13

Scope: Replaced and updated CCTV to IP cameras (Vicon), Intercom (Harding) ,
Relay Electronics to PLC (Modicon PLC), New Relay Backboards, Touchscreen (Citect Software) & Head-end replacement (Racks and Back boards).

ASI Sub Contractors:
ARC Electric & Lighting: Conduit, raceways and 120v applications.
Dardan Construction: Casework, glass & flooring

Lincoln County Juvenile, Citect HMI Upgrade, Newport OR.     $7,700.00
Owner: Lincoln County Sheriff’s Office, Sgt. Tom Graham
Contractor: ARC Security Integration, General Contractor
Completion Date: 9/27/13


Scope: Provide, Install & Program new Citect HMI Software to replace older win cc flex software.

Snohomish County Jail, WA, Security Electronics Upgrade     $482,186.00
Engineer: R&N Systems Design L.L.C., Dennis Sebo
Contractor: Metroplex Control Systems, Rich Schamberger
Completion Date: 2/28/14


Scope: Installation of all field devices (IP Cameras, Intercom stations,
Watch tour, etc.) Installation & testing of all cable (Fiber backbone, CAT 6 and various other types of cable). Installation and testing of head-end equipment being provided by Metroplex Control Systems, (PLC, Intercom, CCTV, Touchscreens, watch tour etc.) Arc Security Integration is a subcontractor to MCS for this scope of work.

ASI Sub Contractors:
PowerCom: Provide, install and test all Fiber cable and assist with installation and testing of CAT 6 cable.

Adult Detention Building DVR Upgrade, Spokane County Jail, WA     $209,224.00
Engineer: Coffman Engineers, Steve Smith
Contractor: ARC Security Integration, General Contractor
Spokane County Construction Manager: Don Coon
Estimated Completion Date: 4/30/14

Scope: Update and replace existing CCTV DVR Video System. Provide, Install and Program new state of the art storage/recording system using Vicon and Pivot 3 equipment. Provide new Air conditioning and Electrical work for existing equipment room and provide new connections to power for new UPS System.

ASI Sub Contractors:
Pro Mechanical Services: Provide and Install new Air Conditioning Unit in existing equipment room.
ARC Electric: Provide Electrical installation for new Air Conditioner unit and power required for new UPS System.


Franklin County Jail Addition, Pasco, WA, Security Elec. Upgrade     $628,113.00
Engineer: HK Engineers, Frank Hopkins
Contractor: Lydig Construction, Tony Corigliano, PM
Completion Date Phase I: 3/19/14 Estimated Completion Date Phase II: 9/30/14

Scope: Provide & Install electronic relay backboards built to UL 508 standards, intercom system head-end components, CCTV system, PLC, Touchscreen, Duress and Fence/Intrusion Detection. Provide and Install security equipment in New Housing Unit Addition and interface existing conditions and electronics into a site wide integrated security system. Project to be completed in 2 phases.


San Juan County Jail, Citect HMI & PC Upgrade, San Juan NM.     $43,177.00
Owner: San Juan County Sheriff’s Office
Contractor: APIC Solutions, General Contractor
Estimated Completion Date: 6/30/14

Scope: Provide 6 new Dell PC’s loaded with Citect HMI Software and programmed to meet the existing conditions.

Martin Hall Juvenile, Medical Lake WA.     $50,135.00
Owner: Martin Hall Juvenile Facility Board
Contractor: Arc Security Integration, Inc. (Design Build)
Completion Date: 1/30/15

Scope: Replace existing control panels with new touch screen control. Provide, program and install new PLC and control relay backboards (built in UL 508 Shop). Provide and install new CCTV Monitors and replace existing casework with new laminated countertops.


San Juan Juvenile Facility, New Mexico     $118,887.00
Owner: San Juan County Sheriff’s Office
Contractor: APIC Solutions, General Contractor
Estimated Completion Date 3/30/15

Scope: Provide electronic relay backboards built to UL 508 standards, intercom system head-end components, interface with CCTV system (provide by others), PLC, Touchscreen. 


Kootenai County Juvenile, Coeur d’ Alene ID.     $129,00.00
Owner: Kootenai County ID
Contractor: Camtek Inc. General Contractor
Estimated Completion Date: 4/30/15

Scope: Provide electronic relay backboards built to UL 508 standards, intercom system head-end components, PLC, Touchscreen. Provide and Install new Casework Countertops.